Skip to main content
Customer · 01 · Pilot 2026Pilot · 2026

Argon Denims,
on one source of truth.

SREEPUR · GAZIPUR · BANGLADESH · EST. 2006

A denim fabric mill in Sreepur, Gazipur, running TraceLoom across dyeing, weaving and finishing. Built over about two weeks, learning their ERP and wiring every source in by hand once, so nothing is hand-keyed again.

Argon Denims rope-dye range: steam venting between indigo dye boxes mid-cycle.
ESTABLISHED
2006
Incorporated 2006 · commercial operations since 2008
WEAVING
111 looms
Air-jet · SOMET and PICANOL
CAPACITY
~18M yd
Denim fabric a year · 4.5 to 13 oz
● WHAT CHANGED AT THE MILL

From quarterly spreadsheets
to a live URL.

Before TraceLoom, Argon's emissions answer to brand buyers was a quarterly spreadsheet, hand-typed by an external consultant from the same utility PDFs the accounts team already had. Welfare audits lived in a binder. The company profile was a PDF dropped in a customer email thread.

Today, utility bills go through the parser on upload and the Oracle ERP feed brings in meter readings, orders and deliveries. Every mill on TraceLoom can publish a public share URL, so a brand's request for emissions data is a link, not an email thread.

The setup took about two weeks: learning Argon's database and ERP, then wiring every source in by hand so nothing is re-keyed. Implementation covered the meter parser and the Oracle ERP export pipeline; everything else was data plumbing on top.

LOCATIONSreepur, Gazipur, Bangladesh
ESTABLISHED2006 · operations since 2008
EMPLOYEES500+
PRODUCT100% cotton & stretch denim · 4.5 to 13 oz
OPERATIONSWarping · Dyeing · Weaving · Finishing
WEAVING111 air-jet looms · SOMET & PICANOL
CAPACITY~18M yards / year
CERTIFICATIONSOEKO-TEX · Organic Content Standard
Argon Denims mill floor · yarn cones on the creel, operator in striped shirt.
● CONNECTORS LIVE AT ARGON

Every source,
read-only.

ERP
  • Oracle ERP feed
  • Meter readings
  • Orders and deliveries
Utility bills
  • Power
  • Gas
  • Water
Reports
  • Production reports
● BE NEXT

Run your mill
on real data.

Argon took about two weeks to connect. A typical full rollout across connectors and pillars takes 4 to 8 weeks.